Artex News

Artex Parkline: Foundation Slab Reinforcement Completed

The second phase of foundation work has been completed at Artex Parkline - the reinforcement of the monolithic slab.

The process involves cutting and tying steel bars (rebar) into a unified cage according to design drawings. A spatial framework covering the entire perimeter of the foundation has been installed.

The steel framework is the backbone of the concrete structure:

  • Structural Stability: The metal framework absorbs tensile forces, while the concrete works in compression. Their combination creates a solid structure.
  • Seismic Resistance: Correctly calculated and assembled reinforcement ensures the building's resistance to seismic shocks and dynamic loads.

Thank you for your trust. We continue building your future home according to pla